i) Concreting of a floor slab is planned and it is the responsibility of the technical staff to ensure the quality of the end product.

Question

a) Briefly explain the list of activities/ items that should be checked, a day before concreting;

b) What are the actions you should take to ensure the quality when the concreting is progressing?

ii) Draw a sketch of English bond and Flemish bond of the right angle corner of the 225mm thick wall.